SAP IdM 8.0 End-of-Life: What to Do Now
December 2027 sounds far away — until you realize migration takes 18–36 months. Here is the timeline, the options, and a realistic path that does not require big-bang.
SAP IdM 8.0 mainstream maintenance ends December 2027. Extended maintenance has a hard stop. If you have not started planning, you are already behind a typical enterprise migration timeline.
Realistic timeline
- Months 1–3: inventory connectors, workflows, and custom ABAP integrations
- Months 4–12: parallel run with target IGA — do not big-bang SAP HR feeds
- Months 12–24: cutover by domain — access requests first, then certification, then provisioning
- Months 24–36: decommission IdM with audit evidence of parity
What to look for in a replacement
Deep SAP connector coverage, workflow parity for complex approval chains, and a path to govern non-SAP identities on the same fabric — including AI agents and non-human identities emerging in your SAP landscape.
EmpowerID has migrated SAP IdM estates for global manufacturers and utilities. Start with a scoped assessment — not a rip-and-replace slide deck.